Home › Electrician › Electrical Panel Upgrades
Upgrade from 60A/100A to 200A service, replace old fuse boxes and unsafe panels, and add sub-panels — coordinated with your utility and ESA.
⭐⭐⭐⭐⭐ 5.0 on GoogleTell us about the job and send a photo if you can.
Fixed price before any work starts.
We file with ESA and do the work cleanly.
ESA inspection and certificate for your records.
Rural and estate homes in Caledon often need service upgrades and generator interlocks — we handle Hydro One coordination.
Typical drive time from our Mississauga office: 30–45 min. Any work affecting your service is coordinated with Hydro One, and every permitted job is filed with the Electrical Safety Authority (ESA).
Bolton, Caledon East, Mayfield West, Inglewood, Palgrave, Alton
Usually a single day, coordinated with your utility.
If you’re adding major loads like an EV charger, heat pump or second unit, often yes — we confirm with a load calculation.
Tell us what you need — we reply within one business day, usually much sooner.
📍 2355 Derry Rd E #43, Mississauga, ON L5S 1V6
✉️ [email protected]
📞 (647) 468-1212
⭐ 5.0 on Google — read our reviews
📞 Call (647) 468-1212